BCA PFI Compliance Support

BCA PFI Compliance Support Singapore

A BCA periodic facade inspection notice gives the building owner or MCST two deadlines: appoint a Competent Person, then submit the inspection report. In the sample notice below, the report is due 6 months after the notice date. If more time is needed, an extension must be requested at least 5 days before the deadline.

SGFacadeScan helps building owners, MCSTs, managing agents and facility managers respond to BCA Periodic Facade Inspection notices in a clear and organised manner. Our support covers notice review, Competent Person appointment coordination, inspection planning, deadline tracking, documentation and PFI report support.

This page is for building owners and MCSTs who have received a BCA facade inspection (PFI) notice and need to understand what to do next. The sample redacted notice below shows the key dates and items that should be checked before inspection planning begins.

Drone facade inspection process for Periodic Facade Inspection Singapore
Sample BCA Periodic Facade Inspection (PFI) notice Singapore (redacted)
Inspection Notice

Received a BCA Periodic Facade Inspection Notice?

A BCA PFI notice is usually the starting point of the compliance workflow. It identifies the building, sets out the requirement for facade inspection and states important deadlines for appointing a Competent Person and submitting the inspection report. The sample notice below shows where to find each of these dates.

Key Dates Highlighted in the Sample Notice

The sample notice shows a notice date of 22/09/2025. It states that the inspection is required to be done within 6 months after the date of the notice by the appointed Competent Person.

BCA PFI Notice

What Building Owners Should Check in the BCA PFI Notice

Check these things in your BCA PFI notice: the building name, address and owner or MCST details; the date of the notice; the deadline to appoint the Competent Person; and the deadline to submit the PFI report to the Commissioner of Building Control. The CP makes both submissions via CORENET.

BCA PFI Compliance

How SGFacadeScan Helps With BCA PFI Compliance

Compliance Stage

How SGFacadeScan Supports You

Notice review

Review the BCA PFI notice, key dates, building information and immediate action items.

Competent Person coordination

Assist with the CP appointment workflow and confirm the technical lead for the PFI process.

Inspection planning

Plan elevations, access methods, visual inspection approach, close-range inspection locations and site coordination needs.

Vendor coordination

Coordinate drone, rope access, boom lift or other access service providers where suitable for the building.

Documentation

Organise drawings, past records, photos, inspection notes, defect schedules and repair recommendation records.

Report support
Support PFI report preparation, owner updates and submission documentation under the review of the Competent Person.
Workflow

Recommended Compliance Workflow After Receiving Notice

Step 1 [by owner]

Send the BCA PFI notice to SGFacadeScan for preliminary review and quotation

Step 2 [by owner]

Appoint SGFacadeScan as the Competent Person

Step 3 [by CP]

Submit relevant documents and BR_PFI01 via Corenet before deadline

Step 4 [by CP]

Review drawings, facade types, access constraints and previous defect or repair records.

Step 5 [by CP]

Plan drone visual survey and close-range inspection access method.

Step 6 [by CP]

Carry out inspection, document findings and assess whether further detailed investigation is required.

Step 7 [by CP]

Prepare and submit the PFI report or interim report as applicable.

Step 8 [by owner]

Carry out repair works where necessary and keep records for future maintenance and next inspection cycle.

Each step is explained in more detail in our PFI process guide.

Resources & FAQs

Frequently Asked Questions About BCA Periodic Facade Inspection

Who can be a Competent Person for PFI in Singapore?

Under the PFI regime, the Competent Person is typically a Registered Architect or Professional Engineer. The CP leads the facade inspection and is responsible for the PFI report, and may be assisted by Facade Inspectors.

Check the notice date, CP appointment deadline and report submission deadline. Then appoint a Competent Person and start inspection planning early.

No. The sample notice dates are for illustration only. Each building owner must follow the actual dates stated in their own notice and the latest BCA requirements.

SGFacadeScan can help review the notice, identify timing risks and advise on practical documentation needed for an extension request. Approval remains subject to the relevant authority.

PFI reporting and submission should be carried out under the professional review of the Competent Person. SGFacadeScan supports documentation, coordination and report preparation workflow.

Free Download

PFI Checklist for MCSTs & Building Owners

A practical preparation guide for managing your Periodic Façade Inspection efficiently — reduce delays and plan follow-up actions with confidence.

Prepared by SGFacadeScan Pte. Ltd. — Competent Person-led PFI guidance.

Get the free PFI Checklist

Tell us where to send it and we’ll email a copy plus practical PFI tips for MCSTs and building owners.

We respect your privacy. Your details are used
only to send this checklist and related PFI guidance.

Elevate image one facade at a time